Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13670570
| No.13670570
- Product Categories
- Friendly Links
| Information Name: | Build drainage board Drainage Board _ _ Edison New Materials |
| Published: | 2015-04-09 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Construct drainage board cone penetration units (or hollow cylindrical porous) plastic floor, from high-impact polystyrene (HIPS) is made. Cone penetration units (or hollow cylindrical porous) bonding the top surface of a non-woven filter layer to prevent soil particles through the drainage board manufacturers, thus avoiding the obstruction-dimensional anti-drain, so that smooth drainage. Garage plastic drainage board, is a dedicated garage drainage in six months, garage plastic drainage board construction to note the following matters! Garage plastic drain 1. This project adopted board core and membrane shall adopt renewable materials. 2. Before garage play set plastic drain board should set bit partition measure and mark composite drainage board to ensure proper construction of the onshore construction zone plate deviation of not more than 50mm, water construction vessel positioning shift deviation of not more than 100mm, and the total number of drainage board design requirements of each section should not be less than. 3. garage to store plastic drainage board should avoid the sun and rain caused tearing, peeling, aging damage, such as the use of pre-injury detect deterioration phenomenon, should be re-sample testing, since the production of the drainage board to fight the best storage period set in six months or less. 4. According to the engineering geological premise should be effective construction measures, such as using a plate vibrating machine, draining board through loose sand play to the design elevation of sand embankment should improve later try to play the older line, according to Try to play the situation to adjust the design or construction programs. 5. A section of plastic drainage board garage play set is completed, the hole should be played in the vicinity when the plate is formed with a sand cushion of sand carefully fill drainage board, plastic drain and buried in the sand cushion. 6. promise garage prefabricated drains located within 5% of the total thrown "rewind" phenomenon, but the "rewind" Length should not exceed 50cm. 7. Cut the plastic plate, sand cushion over the exposed length should be greater than 200mm. Build drainage board Drainage Board _ _ Edison new materials and new materials provided by the Edison Company. Edison New Materials Co., Ltd. (www.fstgcl.com) strong, credible, in Dezhou waterproof, moisture-proof materials industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Edison new materials into the brilliant and you work for a better future! |
Admin>>>
You are the 15447 visitor
Copyright © GuangDong ICP No. 10089450, Edison New Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 15447 visitor
Copyright © GuangDong ICP No. 10089450, Edison New Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

